Hi, I am Chih Hsiung Wang, My LiveDNA is 886.656
 
   
  Home
 
 
 
Dr. Chih Hsiung Wang
 
Highest Degree: Ph.D. in Industrial Engineering from National Taiwan University of Science and Technology, Taiwan
 
Institute: National Pingtung Institute of Commerce, Taiwan
 
Area of Interest: Engineering
  •   Industrial Engineering
  •   Operations Research
  •   EMQ Model
  •   Inspection Policy
 
URL: http://livedna.org/886.656
 
My SELECTED Publications
1:   Wang, C.H. and C.C. Hung, 2008. An offline inspection and disposition model incorporating discrete Weibull distribution and manufacturing variation. Operat. Res. Soc. Jap., 51: 155-165.
Direct Link  |  
2:   Wang, C.H. and F.C. Meng, 2009. Optimal lot size and offline inspection policy. Comput. Math. Appl., 58: 1921-1929.
CrossRef  |  Direct Link  |  
3:   Wang, C.H. and R.H. Yeh, 2009. Utilizing an approximative solution to obtain the real optimal solution for a production and inspection mode. Applied Math. Modell., 33: 3769-3775.
Direct Link  |  
4:   Wang, C.H. and S.H. Sheu, 2000. Fast approach to the optimal production/PM policy. Comput. Math. Appl., 40: 1297-1314.
CrossRef  |  Direct Link  |  
5:   Wang, C.H. and S.H. Sheu, 2001. Simultaneous determination of the optimal production–inventory and product inspection policies for a deteriorating production system. Comput. Operat. Res., 28: 1093-1110.
CrossRef  |  Direct Link  |  
6:   Wang, C.H. and S.H. Sheu, 2001. The effects of the warranty cost on the imperfect EMQ model with general discrete shift distribution. Prod. Plann. Control, 12: 621-628.
CrossRef  |  Direct Link  |  
7:   Wang, C.H. and S.H. Sheu, 2003. Determining the optimal production-maintenance policy with inspection errors: using a Markov chain. Comput. Operat. Res., 30: 1-17.
CrossRef  |  Direct Link  |  
8:   Wang, C.H. and S.H. Sheu, 2003. Optimal lot sizing for products sold under free-repair warranty. Eur. J. Operat. Res., 149: 131-141.
CrossRef  |  Direct Link  |  
9:   Wang, C.H., 2004. The impact of a free-repair warranty policy on EMQ model for imperfect production systems. Comput. Operat. Res., 31: 2021-2035.
CrossRef  |  Direct Link  |  
10:   Wang, C.H., 2005. Integrated production and product inspection policy for a deteriorating production system. Int. J. Prod. Econ., 95: 123-134.
CrossRef  |  Direct Link  |  
11:   Wang, C.H., 2006. A note on a (Q, r) model. J. Statist. Manage. Syst., 9: 689-698.
Direct Link  |  
12:   Wang, C.H., 2006. A production model with imperfect preventive maintenance. J. Statist. Manage. Syst., 8: 601-613.
CrossRef  |  Direct Link  |  
13:   Wang, C.H., 2006. Optimal production and maintenance policy for imperfect production systems. Naval Res. Logistics, 53: 152-156.
CrossRef  |  Direct Link  |  
14:   Wang, C.H., 2007. Economic off-line quality control strategy with two types of inspection errors. Eur. J. Operat. Res., 179: 132-147.
CrossRef  |  Direct Link  |  
15:   Wang, C.H., 2008. A game-theoretic approach for determining the economic manufacturing quantity and mutual inspection policy under a quality contract. Operat. Res. Soc. Jap., 51: 274-283.
Direct Link  |  
16:   Wang, C.H., 2009. Determining the optimal probing lot size for the wafer probe operation in semiconductor manufacturing. Eur. J. Operat. Res., 197: 126-133.
CrossRef  |  Direct Link  |  
17:   Wang, C.H., D.L. Yang, T.H. Wu, W.H. Kuo and N.H. Shih, 2004. Impact of inspection errors on the lot size problem. J. Inform. Optimization Sci., 25: 331-348.
CrossRef  |  Direct Link  |  
18:   Wang, C.H., M.H. Shu and I.M. Chao, 2006. Capital investment in set up cost reduction for a lot-size, reorder point model. J. Inform. Optimization Sci., 27: 249-258.
CrossRef  |  Direct Link  |  
19:   Wang, C.H., R.H. Yeh and P. Wu, 2006. Optimal production time and number of maintenance actions for an imperfect production system under equal-interval maintenance policy. J. Operat. Res. Soc., 57: 262-270.
CrossRef  |  Direct Link  |  
20:   Wang, H.F. and C.H. Wang, 1988. Modelling of optimal expansion of a fuzzy competence set. Int. Trans. Operat. Res., 5: 413-424.
CrossRef  |  Direct Link  |  
21:   Wang, H.F. and C.H. Wang, 1999. A fixed-charge model with fuzzy inequality constraints composed by max-product operator. Comput. Math. Appl., 36: 23-29.
CrossRef  |  Direct Link  |  
22:   Yeh, R.H., H.D. Chen and C.H. Wang, 2005. An inspection model with discount factor for products having Weibull lifetime. Int. J. Operat. Res., 2: 77-81.
Direct Link  |