Dr. Fariborz Jolai
My Social Links

Dr. Fariborz Jolai

Associate Professor
University of Tehran, Iran


Highest Degree
Ph.D. in Industrial Engineering from Institute National Poly Technique de Grenoble, France

Share this Profile

Area of Interest:

Engineering
100%
Industrial Engineering
62%
Scheduling
90%
Supply Chain Management
75%
Inventory Control
55%

Research Publications in Numbers

Books
1
Chapters
5
Articles
269
Abstracts
30

Selected Publications

  1. Tavakkoli-Moghaddam, R., B. Javadi, F. Jolai and A. Ghodratnama, 2010. The use of a fuzzy multi-objective linear programming for solving a multi-objective single-machine scheduling problem. Applied Soft Comput., 10: 919-925.
    CrossRef  |  Direct Link  |  
  2. Safaei, A.S., S.M.M. Husseini, R.Z.-Farahani, F. Jolai, S.H. Ghodsypour, 2010. Integrated multi-site production-distribution planning in supply chain by hybrid modelling. Int. J. Prod. Res., 48: 4043-4069.
    CrossRef  |  Direct Link  |  
  3. Sabouni, M.T.Y., F. Jolai and A. Mansouri, 2010. Heuristics for minimizing total completion time and maximum lateness on identical parallel machines with setup times. J. Intell. Manuf., 21: 439-449.
    CrossRef  |  Direct Link  |  
  4. Pishvaee, M.S., F. Jolai and J. Razmi, 2010. A stochastic optimization model for integrated forward/reverse logistics network design. J. Manuf. Syst., 28: 107-114.
    CrossRef  |  Direct Link  |  
  5. Mirabi, M., S.M.T.F. Ghomi and F. Jolai, 2010. A hybrid electromagnetism-like algorithm for supplier selection in make-to-order planning. Scientia Iranica, 17: 1-11.
    Direct Link  |  
  6. Kashan, A.H., B. Karimi and F. Jolai, 2010. An effective hybrid multi-objective genetic algorithm for bi-criteria scheduling on a single batch processing machine with non-identical job sizes. Eng. Appl. Artif. Intell., 23: 911-922.
    CrossRef  |  Direct Link  |  
  7. Jolai, F., S.M. Asadzadeh and M.R. Taghizadeh, 2010. A preemptive discrete-time priority buffer system with partial buffer sharing. Applied Mathematical Modelling, 34: 2148-2165.
    CrossRef  |  Direct Link  |  
  8. Jolai, F., M.S. Sangari, M. Babaie, 2010. Pareto simulated annealing and colonial competitive algorithm to solve an offline scheduling problem with rejection. J. Eng. Manuf., 224: 1119-1131.
    CrossRef  |  Direct Link  |  
  9. Jolai, F. and A. Ghanbari, 2010. Integrating data transformation techniques with Hopfield neural networks for solving travelling salesman problem. Expert Syst. Applic., 37: 5331-5335.
    CrossRef  |  Direct Link  |  
  10. Hatefi, S.M. and F. Jolai, 2010. A new model for classifying inputs and outputs and evaluating the performance of DMUs based on translog output distance function. Applied Math. Modell., 34: 1439-1449.
    CrossRef  |  Direct Link  |  
  11. Mirsanei, H.S., B. Karimi and F. Jolai, 2009. Flow shop scheduling with two batch processing machines and nonidentical job sizes. Int. J. Aad. Manuf. Technol., 45: 553-572.
    CrossRef  |  Direct Link  |  
  12. Layegh, J., F. Jolai and M.S. Amalnik, 2009. A memetic algorithm for minimizing the total weighted completion time on a single machine under step-deterioration. Adv. Eng. Software, 4: 1074-1077.
    CrossRef  |  Direct Link  |  
  13. Jolai, F., M.J. Rezaee and A. Vazifeh, 2009. Multi-criteria decision making for assembly line balancing. J. Intell. Manuf., 20: 113-121.
    CrossRef  |  Direct Link  |  
  14. Jolai, F. S. Sheikh, M. Rabbani and B. Karimi, 2009. A genetic algorithm for solving no-wait flexible flow lines with due window and job rejection. Int. J. Adv. Manuf. Technol., 42: 523-532.
    CrossRef  |  Direct Link  |  
  15. Fattahi, P., F. Jolai and J. Arkat, 2009. Flexible job shop scheduling with overlapping in operations. Applied Mathem. Model., 33: 3076-3087.
    CrossRef  |  Direct Link  |  
  16. Ebadian, M., M. Rabbani, S.A. Torabi and F. Jolai, 2009. Hierarchical production planning and scheduling in make-to-order environments: reaching short and reliable delivery dates. Int. J. Prod. Res., 47: 5761-5789.
    CrossRef  |  Direct Link  |  
  17. Pishvaee, M.S. M. Fathi and F. Jolai, 2008. A fuzzy clustering-based method for scenario analysis in strategic planning: The case of an Asian pharmaceutical company. South Afr. J. Bus. Manage., 39: 21-31.
    Direct Link  |  
  18. Jolai, F., S.M. Asadzadeh and M.R. Taghizadeh, 2008. Performance estimation of an email contact center by a finite source discrete time Geo/Geo/1 queue with disasters. Comput. Ind. Eng., 55: 543-556.
    CrossRef  |  Direct Link  |  
  19. Javadi, B., M. Saidi-Mehrabad, A. Haji, I. Mahdavi, F. Jolai and N. Mahdavi-Amiri, 2008. No-wait flow shop scheduling using fuzzy multi-objective linear programming. J. Franklin Inst., 345: 452-467.
    CrossRef  |  Direct Link  |  
  20. Ebadian, M., M. Rabbani, F. Jolai, S.A. Torabi and R. Tavakkoli-Moghaddam, 2008. A new decision-making structure for the order entry stage in make-to-order environments. Int. J. Prod. Econ., 111: 351-367.
    CrossRef  |  Direct Link  |  
  21. Rahimi-Vahed, A. R., M. Rabbani, R. Tavakkoli-Moghaddam, S.A. Torabi and F. Jolai, 2007. A multi-objective scatter search for a mixed-model assembly line sequencing problem. Adv. Eng. Infor., 21: 85-99.
    CrossRef  |  Direct Link  |  
  22. Fattahi, P., M. Saidi Mehrabad and F. Jolai, 2007. Mathematical modeling and heuristic approaches to flexible job shop scheduling problems. J. Intel. Manuf., 18: 331-342.
    CrossRef  |  Direct Link  |