Abed, A.M., 2017. Reduce defects by controlling the spraying process via images compare and revamping lean six sigma toolbox. Ind. Eng. Manage., Vol. 6. 10.4172/2169-0316.1000205. CrossRef | Direct Link |
Abed, A.M., 2016. Creating E-pedigree Kanban to secure customers chain using multi-agent image technique. J. Eng. Comput. Innov., 4: 1-10. Direct Link |
Abed, A.M., 2016. Adjust Jidoka occupational fatigue to reduce idle times using data mining as lean tool. Egypt. Int. J. Eng. Sci. Technol., 19: 312-318. Direct Link |
Abed, A.M., 2015. Create Heijunka 5's matrix to control the dynamic Gemba as lean tool. J. Hum. Resour. Manage., 3: 6-16. CrossRef | Direct Link |
Abed, A.M. and S.E. Farag, 2014. Control vortex position in a vertical tube to reduce spray defects and revamping six-sigma image verification tool. Egypt. Int. J. Eng. Sci. Technol., 17: 178-185. Direct Link |
Ibrahim, M.S., M.A.R. Mansour and A.M. Abed, 2012. Improving the quality of thermoforming process using a proposed analysis algorithm (a case study). Applied Mech. Mater., 110-116: 1466-1476. CrossRef | Direct Link |
Ibrahim, S., M.A.H. Mansour and A.M. Abed, 2011. Improving process quality by new lean six sigma methodology for revamping online production lines training. Egypt. Int. J. Eng. Sci. Technol., 14: 611-620. Direct Link |
Ibrahim, M.S., M.A.R. Mansour and A.M. Abed, 2011. Improve six-sigma management by forecasting production quantity using image verification quality tool. Int. J. Adv. Eng. Technol., 1: 332-342. Direct Link |