Dr. Dar-Li Yang

Professor
National Formosa University, Taiwan


Highest Degree
Ph.D. in Industrial Engineering from National Tsing Hua University, Taiwan

Share this Profile

Area of Interest:

Engineering
Operations Research
Production Scheduling
Supply Chain Scheduling
Data Mining

Selected Publications

  1. Xu, D., L. Wan, A. Liu and D.L. Yang, 2015. Single machine total completion time scheduling problem with workload-dependent maintenance duration. Omega, 52: 101-106.
    Direct Link  |  

  2. Xu, D., D.L. Yang, M. Liu, F. Chu and I. Kacem, 2015. Recent advances in combinatorial optimization. Sci. World J., .

  3. Hsieh, P.H., S.J. Yang and D.L. Yang, 2015. Decision support for unrelated parallel machine scheduling with discrete controllable processing times. Appl. Soft Comput., 30: 475-483.
    Direct Link  |  

  4. Yang, S.J., C.J. Hsu and D.L. Yang, 2014. Note on unrelated parallel-machine scheduling with rate-modifying activities to minimize the total completion time. Inf. Sci., 260: 215-217.
    Direct Link  |  

  5. Yang, D.L., T.C.E. Cheng and S.J. Yang, 2014. Parallel-machine scheduling with controllable processing times and rate-modifying activities to minimise total cost involving total completion time and job compressions. Int. J. Prod. Res., 52: 1133-1141.
    Direct Link  |  

  6. Yang, D.L., C.J. Lai and S.J. Yang, 2014. Scheduling problems with multiple due windows assignment and controllable processing times on a single machine. Int. J. Prod. Econ., 150: 96-103.
    Direct Link  |  

  7. Xu, D., A. Liu and D.L. Yang, 2014. Mathematical programming models for competitive two-agent single-machine scheduling with flexible periodic maintenance activities. Arabian J. Sci. Eng., 39: 3715-3722.
    Direct Link  |  

  8. Hsu, C.J. and D.L. Yang, 2014. Unrelated parallel-machine scheduling with position-dependent deteriorating jobs and resource-dependent processing time. Optim. Lett., 8: 519-531.
    Direct Link  |  

  9. Hou, Y.T., D.L. Yang and W.H. Kuo, 2014. Lot scheduling on a single machine. Inf. Process. Lett., 114: 718-722.
    Direct Link  |  

  10. Cheng, T.C.E., W.H. Kuo and D.L. Yang, 2014. Scheduling with a position-weighted learning effect. Optim. Lett., 8: 293-306.
    Direct Link  |  

  11. Yang, S.J., J.Y. Guo, H.T. Lee and D.L. Yang, 2013. Single-machine scheduling problems with past-sequence-dependent delivery times and deterioration and learning effects simultaneously. Int. J. Innovative Comput. Inf. Control, 9: 3981-3989.

  12. Yang, S.J. and D.L. Yang, 2013. Note on A unique integer mathematical model for scheduling deteriorating jobs with rate-modifying activities on a single machine. Int. J. Adv. Manuf. Technol., .

  13. Yang, D.L., T.C.E. Cheng and W.H. Kuo, 2013. Scheduling with a general learning effect. Int. J. Adv. Manuf. Technol., 67: 217-229.
    Direct Link  |  

  14. Yang, D.L. and S.J. Yang, 2013. Unrelated parallel-machine scheduling problems with multiple rate-modifying activities. Inf. Sci., 235: 280-286.
    Direct Link  |  

  15. Xu, D. and D.L. Yang, 2013. Makespan minimization for two parallel machines scheduling with a periodic availability constraint: mathematical programming model, average-case analysis, and anomalies. Appl. Math. Modell., 37: 7561-7567.
    Direct Link  |  

  16. Wang, J.B., C.J. Hsu and D.L. Yang, 2013. Single-machine scheduling with effects of exponential learning and general deterioration. Appl. Math. Modell., 37: 2293-2299.
    Direct Link  |  

  17. Lee, H.T., D.L. Yang and S.J. Yang, 2013. Multi-machine scheduling with deterioration effects and maintenance activities for minimizing the total earliness and tardiness costs. Int. J. Adv. Manuf. Technol., 66: 547-554.
    Direct Link  |  

  18. Ji, M., C.J. Hsu and D.L. Yang, 2013. Single-machine scheduling with deteriorating jobs and aging effects under an optional maintenance activity consideration. J. Comb. Optim., 26: 437-447.
    Direct Link  |  

  19. Hsu, C.J., M. Ji, J.Y. Guo and D.L. Yang, 2013. Unrelated parallel-machine scheduling problems with aging effects and deteriorating maintenance activities. Inf. Sci., 253: 163-169.
    Direct Link  |  

  20. Cheng, T.C.E., W.H. Kuo and D.L. Yang, 2013. Scheduling with a position-weighted learning effect based on sum-of-logarithm-processing-times and job position. Inf. Sci., 221: 490-500.
    Direct Link  |  

  21. Yang, S.J., C.J. Hsu and D.L. Yang, 2012. Single-machine scheduling and slack due-date assignment with aging effect and deteriorating maintenance. Optim. Lett., 6: 1855-1873.
    Direct Link  |  

  22. Yang, S.J., C.J. Hsu and D.L. Yang, 2012. Note on unrelated parallel-machine scheduling with deteriorating maintenance activities. Comput. Ind. Eng., 62: 1141-1143.
    Direct Link  |  

  23. Yang, S.J. and D.L. Yang, 2012. Single-machine scheduling problems with past-sequence-dependent delivery times and position-dependent processing times. J. Oper. Res. Soc., 63: 1508-1515.
    Direct Link  |  

  24. Yang, S.J. and D.L. Yang, 2012. Single-machine scheduling problems simultaneous with deteriorating and learning effects under a deteriorating maintenance consideration. Just Time Syst., 2012: 41-65.
    Direct Link  |  

  25. Yang, D.L., T.C.E.Cheng, S.J. Yang and C.J. Hsu, 2012. Unrelated parallel-machine scheduling with aging effects and multi-maintenance activities. Comput. Oper. Res., 39: 1458-1464.
    Direct Link  |  

  26. Yang, D.L., H.T. Lee and S.J. Yang, 2012. Unrelated parallel-machine scheduling simultaneously with rate-modifying activities and earliness and tardiness penalties. J. Chin. Inst. Ind. Eng., 29: 282-289.
    Direct Link  |  

  27. Kuo, W.H., C.J. Hsu and D.L. Yang, 2012. Worst-case and numerical analysis of heuristic algorithms for flowshop scheduling problems with a time-dependent learning effect. Inf. Sci., 184: 282-297.
    Direct Link  |  

  28. Kuo, W.H. and D.L. Yang, 2012. Single-machine scheduling with deteriorating jobs. Int. J. Syst. Sci., 43: 132-139.
    Direct Link  |  

  29. Kuo, W.H. and D.L. Yang, 2012. A short note on Proportionate flowshops with general position-dependent processing times. Inf. Process. Lett., 112: 479-480.
    Direct Link  |  

  30. Cheng, T.C.E., S.J. Yang and D.L. Yang, 2012. Common due-window assignment and scheduling of linear time-dependent deteriorating jobs and a deteriorating maintenance activity. Int. J. Prod. Econ., 135: 154-161.
    Direct Link  |  

  31. Zhao, C.L., C.L. Hsu and D.L. Yang, 2011. Considerations of single-machine scheduling with deteriorating jobs. Appl. Math. Modell., 35: 5134-5142.
    Direct Link  |  

  32. Yang, S.J., D.L. Yang and T.R. Chang, 2011. Single-machine scheduling with joint deterioration and learning effects under group technology and group availability assumptions. J. Chin. Inst. Ind. Eng., 28: 597-605.
    Direct Link  |  

  33. Yang, S.J., C.J. Hsu, T.R. Chang and D.L. Yang, 2011. Single-machine scheduling with past-sequence-dependent delivery times and learning effect. J. Chin. Inst. Ind. Eng., 28: 247-255.
    Direct Link  |  

  34. Yang, S.J. and D.L. Yang, 2011. Single-machine scheduling simultaneous with position-based and sum-of-processing-times-based learning considerations under group technology assumption. Appl. Math. Modell., 35: 2068-2074.
    Direct Link  |  

  35. Yang, D.L. and W.H. Kuo, 2011. Scheduling with deteriorating jobs and learning effects. Appl. Math. Comput., 218: 2069-2073.
    Direct Link  |  

  36. Wang, J.B., D.L. Yang and C.J. Hsu, 2011. Single-machine scheduling to minimize absolute value in maximum lateness with deteriorating jobs. Adv. Mat. Res., 201-203: 1054-1060.
    CrossRef  |  Direct Link  |  

  37. Kuo, W.H., C.J. Hsu and D.L. Yang, 2011. Some unrelated parallel machine scheduling problems with past-sequence-dependent setup time and learning effects. Comput. Ind. Eng., 61: 179-183.
    Direct Link  |  

  38. Kuo, W.H. and D.L. Yang, 2011. A note on due-date assignment and single-machine scheduling with deteriorating jobs and learning effects. J. Operat. Res. Soc., 62: 206-210.
    CrossRef  |  Direct Link  |  

  39. Hsu, C.J., W.H. Kuo and D.L. Yang, 2011. Unrelated parallel machine scheduling with past-sequence-dependent setup time and learning effects. Applied Math. Modelling, 35: 1492-1496.
    CrossRef  |  Direct Link  |  

  40. Hsu, C.J., T.E. Cheng and D.L. Yang, 2011. Unrelated parallel-machine scheduling with rate-modifying activities to minimize the total completion time. Inf. Sci., 181: 4799-4803.

  41. Hsu, C.J., S.J. Yang and D.L. Yang, 2011. Two due date assignment problems with position-dependent processing time on a single-machine. Comput. Ind. Eng., 60: 796-800.
    Direct Link  |  

  42. Hsu, C.J., S.J. Yang and D.L. Yang, 2011. Due-date assignment and optional maintenance activity scheduling problem with linear deteriorating jobs. J. Marine Sci. Technol., 19: 97-100.
    Direct Link  |  

  43. Cheng, T.C.E., C.J. Hsu and D.L. Yang, 2011. Unrelated parallel-machine scheduling with deteriorating maintenance activities. Comput. Ind. Eng., 60: 602-605.
    CrossRef  |  Direct Link  |  

  44. Yang, S.J., D.L. Yang and T.C.E. Cheng, 2010. Single-machine due-window assignment and scheduling with job-dependent aging effects and deteriorating maintenance. Comput. Operat. Res., 37: 1510-1514.
    CrossRef  |  Direct Link  |  

  45. Yang, S.J., C.J. Hsu and D.L. Yang, 2010. Single-machine scheduling with due-date assignment and aging effect under a deteriorating maintenance activity consideration. Int. J. Inform. Manage. Sci., 21: 177-195.
    Direct Link  |  

  46. Yang, S.J., C.J. Hsu and D.L. Yang, 2010. Parallel-machine scheduling with setup and removal times under consideration of the learning effect. J. Chinese Instit. Ind. Eng., 27: 372-378.
    CrossRef  |  Direct Link  |  

  47. Yang, S.J. and D.L. Yang, 2010. Single-machine scheduling problems with aging/deteriorating effect under an optional maintenance activity consideration. INFOR: Inform. Syst. Operat. Res., 48: 171-179.
    CrossRef  |  Direct Link  |  

  48. Yang, S.J. and D.L. Yang, 2010. Single-machine group scheduling problems under the effects of deterioration and learning. Comput. Indus. Eng., 58: 754-758.
    CrossRef  |  Direct Link  |  

  49. Yang, S.J. and D.L. Yang, 2010. Note on A note on single-machine group scheduling problems with position-based learning effect. Applied Math. Modelling, 34: 4306-4308.
    CrossRef  |  Direct Link  |  

  50. Yang, S.J. and D.L. Yang, 2010. Minimizing the total completion time in single-machine scheduling with aging/deteriorating effects and deteriorating maintenance activities. Comput. Math. Applic., 60: 2161-2169.
    CrossRef  |  Direct Link  |  

  51. Yang, S.J. and D.L. Yang, 2010. Minimizing the makespan on single-machine scheduling with aging effect and variable maintenance activities. Omega, 38: 528-533.
    CrossRef  |  Direct Link  |  

  52. Yang, D.L. and W.H. Kuo, 2010. Some scheduling problems with deteriorating jobs and learning effects. Comput. Ind. Eng., 58: 25-28.
    CrossRef  |  Direct Link  |  

  53. Kuo, W.H. and D.L. Yang, 2010. Note on single-machine and flowshop scheduling with a general learning effect model and some single-machine and m-machine flowshop scheduling problems with learning considerations. Infor. Sci., 180: 3814-3816.
    CrossRef  |  Direct Link  |  

  54. Cheng, T.C.E., S.J. Yang and D.L. Yang, 2010. Common due-window assignment and scheduling of linear time-dependent deteriorating jobs and a deteriorating maintenance activity. Int. J. Prod. Econ., 10.1016/j.ijpe.2010.10.005.
    CrossRef  |  Direct Link  |  

  55. Yang, D.L. and W.H. Kuo, 2009. Single-machine scheduling with both deterioration and learning effects. Ann. Operat. Res., 172: 315-327.
    CrossRef  |  Direct Link  |  

  56. Yang, D.L. and W.H. Kuo, 2009. A single-machine scheduling problem with learning effects in intermittent batch production. Comput. Ind. Eng., 57: 762-765.
    CrossRef  |  Direct Link  |  

  57. Yang, D.L., W.H. Kuo and M.S. Chern, 2008. Multi-family scheduling in a two-machine reentrant flow shop with setups. Eur. J. Operational Res., 187: 1160-1170.
    CrossRef  |  Direct Link  |  

  58. Yang, D.L., C.J. Hsu and W.H. Kuo, 2008. A two-machine flowshop scheduling problem with a separated maintenance constraint. Comput. Operat. Res., 35: 876-883.
    CrossRef  |  Direct Link  |  

  59. Kuo, W.H. and D.L. Yang, 2008. Minimizing the makespan in a single-machine scheduling problem with the cyclic process of an aging effect. J. Operat. Res. Soc., 59: 416-420.
    CrossRef  |  Direct Link  |  

  60. Kuo, W.H. and D.L. Yang, 2008. A note on due-date assignment and single-machine scheduling with deteriorating jobs. J. Operat. Res. Soc., 59: 857-859.
    CrossRef  |  Direct Link  |