Dr. Fariborz Jolai

Associate Professor
University of Tehran, Iran


Highest Degree
Ph.D. in Industrial Engineering from Institute National Poly Technique de Grenoble, France

Share this Profile

Area of Interest:

Engineering
Industrial Engineering
Scheduling
Supply Chain Management
Inventory Control

Selected Publications

  1. Tavakkoli-Moghaddam, R., B. Javadi, F. Jolai and A. Ghodratnama, 2010. The use of a fuzzy multi-objective linear programming for solving a multi-objective single-machine scheduling problem. Applied Soft Comput., 10: 919-925.
    CrossRef  |  Direct Link  |  

  2. Safaei, A.S., S.M.M. Husseini, R.Z.-Farahani, F. Jolai, S.H. Ghodsypour, 2010. Integrated multi-site production-distribution planning in supply chain by hybrid modelling. Int. J. Prod. Res., 48: 4043-4069.
    CrossRef  |  Direct Link  |  

  3. Sabouni, M.T.Y., F. Jolai and A. Mansouri, 2010. Heuristics for minimizing total completion time and maximum lateness on identical parallel machines with setup times. J. Intell. Manuf., 21: 439-449.
    CrossRef  |  Direct Link  |  

  4. Pishvaee, M.S., F. Jolai and J. Razmi, 2010. A stochastic optimization model for integrated forward/reverse logistics network design. J. Manuf. Syst., 28: 107-114.
    CrossRef  |  Direct Link  |  

  5. Mirabi, M., S.M.T.F. Ghomi and F. Jolai, 2010. A hybrid electromagnetism-like algorithm for supplier selection in make-to-order planning. Scientia Iranica, 17: 1-11.
    Direct Link  |  

  6. Kashan, A.H., B. Karimi and F. Jolai, 2010. An effective hybrid multi-objective genetic algorithm for bi-criteria scheduling on a single batch processing machine with non-identical job sizes. Eng. Appl. Artif. Intell., 23: 911-922.
    CrossRef  |  Direct Link  |  

  7. Jolai, F., S.M. Asadzadeh and M.R. Taghizadeh, 2010. A preemptive discrete-time priority buffer system with partial buffer sharing. Applied Mathematical Modelling, 34: 2148-2165.
    CrossRef  |  Direct Link  |  

  8. Jolai, F., M.S. Sangari, M. Babaie, 2010. Pareto simulated annealing and colonial competitive algorithm to solve an offline scheduling problem with rejection. J. Eng. Manuf., 224: 1119-1131.
    CrossRef  |  Direct Link  |  

  9. Jolai, F. and A. Ghanbari, 2010. Integrating data transformation techniques with Hopfield neural networks for solving travelling salesman problem. Expert Syst. Applic., 37: 5331-5335.
    CrossRef  |  Direct Link  |  

  10. Hatefi, S.M. and F. Jolai, 2010. A new model for classifying inputs and outputs and evaluating the performance of DMUs based on translog output distance function. Applied Math. Modell., 34: 1439-1449.
    CrossRef  |  Direct Link  |  

  11. Mirsanei, H.S., B. Karimi and F. Jolai, 2009. Flow shop scheduling with two batch processing machines and nonidentical job sizes. Int. J. Aad. Manuf. Technol., 45: 553-572.
    CrossRef  |  Direct Link  |  

  12. Layegh, J., F. Jolai and M.S. Amalnik, 2009. A memetic algorithm for minimizing the total weighted completion time on a single machine under step-deterioration. Adv. Eng. Software, 4: 1074-1077.
    CrossRef  |  Direct Link  |  

  13. Jolai, F., M.J. Rezaee and A. Vazifeh, 2009. Multi-criteria decision making for assembly line balancing. J. Intell. Manuf., 20: 113-121.
    CrossRef  |  Direct Link  |  

  14. Jolai, F. S. Sheikh, M. Rabbani and B. Karimi, 2009. A genetic algorithm for solving no-wait flexible flow lines with due window and job rejection. Int. J. Adv. Manuf. Technol., 42: 523-532.
    CrossRef  |  Direct Link  |  

  15. Fattahi, P., F. Jolai and J. Arkat, 2009. Flexible job shop scheduling with overlapping in operations. Applied Mathem. Model., 33: 3076-3087.
    CrossRef  |  Direct Link  |  

  16. Ebadian, M., M. Rabbani, S.A. Torabi and F. Jolai, 2009. Hierarchical production planning and scheduling in make-to-order environments: reaching short and reliable delivery dates. Int. J. Prod. Res., 47: 5761-5789.
    CrossRef  |  Direct Link  |  

  17. Pishvaee, M.S. M. Fathi and F. Jolai, 2008. A fuzzy clustering-based method for scenario analysis in strategic planning: The case of an Asian pharmaceutical company. South Afr. J. Bus. Manage., 39: 21-31.
    Direct Link  |  

  18. Jolai, F., S.M. Asadzadeh and M.R. Taghizadeh, 2008. Performance estimation of an email contact center by a finite source discrete time Geo/Geo/1 queue with disasters. Comput. Ind. Eng., 55: 543-556.
    CrossRef  |  Direct Link  |  

  19. Javadi, B., M. Saidi-Mehrabad, A. Haji, I. Mahdavi, F. Jolai and N. Mahdavi-Amiri, 2008. No-wait flow shop scheduling using fuzzy multi-objective linear programming. J. Franklin Inst., 345: 452-467.
    CrossRef  |  Direct Link  |  

  20. Ebadian, M., M. Rabbani, F. Jolai, S.A. Torabi and R. Tavakkoli-Moghaddam, 2008. A new decision-making structure for the order entry stage in make-to-order environments. Int. J. Prod. Econ., 111: 351-367.
    CrossRef  |  Direct Link  |  

  21. Rahimi-Vahed, A. R., M. Rabbani, R. Tavakkoli-Moghaddam, S.A. Torabi and F. Jolai, 2007. A multi-objective scatter search for a mixed-model assembly line sequencing problem. Adv. Eng. Infor., 21: 85-99.
    CrossRef  |  Direct Link  |  

  22. Fattahi, P., M. Saidi Mehrabad and F. Jolai, 2007. Mathematical modeling and heuristic approaches to flexible job shop scheduling problems. J. Intel. Manuf., 18: 331-342.
    CrossRef  |  Direct Link  |